Built from the base up
Floor Tiling Coventry
A beautiful tiled floor depends on what sits beneath it. We inspect, prepare and level the surface before laying tiles for a precise, durable result.

What we provide
Preparation you can rely on
Where needed, we use primers, levelling compounds, backer boards or decoupling membranes to create the right foundation. Tiles are then carefully set out, cut, fixed, grouted and cleaned down.
Porcelain, ceramic and natural stone
Kitchens, bathrooms and hallways
Subfloor preparation and levelling
Suitable underfloor heating installations
Experience at every stage
A tiled floor is only as good as its foundation
Floor preparation is central to a long-lasting tiled finish. We inspect the existing base for movement, cracks, uneven areas and contamination before recommending the appropriate method. Concrete floors may need priming or levelling, while timber floors can require strengthening, backer boards or a decoupling solution.
The layout is then planned around doorways, kitchen units, sanitaryware and the main sight lines through the room. This gives a balanced appearance and helps transitions into neighbouring spaces feel clean and considered.
We install porcelain, ceramic, quarry, wood-effect and natural stone floor tiles in domestic and commercial settings. Where tiles are being laid over a suitable underfloor-heating system, compatible flexible adhesives and grouts are selected for the installation.
Typical applications
What this service can include
Every quotation is tailored to the room, background, tile specification and finish you want to achieve.
Kitchens, bathrooms and utility rooms
Hallways, entrances and open-plan interiors
Wet-room floors and shower areas
Commercial and high-traffic tiled surfaces
How we work
From first visit to final clean-down
Clear advice, considered preparation and professional installation at every stage.
Discuss
Tell us about the space, tiles and finish you have in mind.
Assess
We inspect the surfaces and identify any preparation required.
Plan
Layout, materials, access and work sequence are agreed.
Install
Tiles are carefully cut, fixed, aligned, grouted and finished.
Handover
The area is cleaned down and the completed work reviewed.
Useful answers
Frequently asked questions
Can you level the floor before tiling?
Yes. After assessing the substrate, suitable levelling products or preparation methods can be used where required.
Can tiles be fitted over underfloor heating?
They can be fitted over many suitable systems when the substrate, commissioning process and fixing materials are appropriate.
How long before a tiled floor can be walked on?
This depends on the products and conditions. We provide clear guidance for your installation before leaving the project.
Your project starts here
Ready to transform your space?
Tell us what you have in mind and arrange a free, no-obligation quotation.
